Faster, More Efficient PLC Software Development Process for the Automotive Industry
Demetrio Cortese, IVECO Embedded Software Design
To capitalize on a market opportunity in Latin America for a range of medium- to heavy-duty vehicles, Iveco had to design, implement, test, and deliver a shift range inhibitor system for vehicles with 9- and 16-speed transmissions in about six weeks. The aggressive deadline required a compressed software development schedule that left no room for specification or implementation errors. Model-Based Design with Simulink and Simulink PLC Coder™ enabled Iveco engineers to complete the transmission management system on schedule using existing programmable logic controller (PLC) hardware.
Recorded: 13 Jun 2013
Featured Product
Simulink PLC Coder
Select a Web Site
Choose a web site to get translated content where available and see local events and offers. Based on your location, we recommend that you select: .
You can also select a web site from the following list
How to Get Best Site Performance
Select the China site (in Chinese or English) for best site performance. Other bat365 country sites are not optimized for visits from your location.
Americas
- América Latina (Español)
- Canada (English)
- United States (English)
Europe
- Belgium (English)
- Denmark (English)
- Deutschland (Deutsch)
- España (Español)
- Finland (English)
- France (Français)
- Ireland (English)
- Italia (Italiano)
- Luxembourg (English)
- Netherlands (English)
- Norway (English)
- Österreich (Deutsch)
- Portugal (English)
- Sweden (English)
- Switzerland
- United Kingdom (English)
Asia Pacific
- Australia (English)
- India (English)
- New Zealand (English)
- 中国
- 日本Japanese (日本語)
- 한국Korean (한국어)